The map below shows the nature restoration, inland dredging, anchoring & rental reference projects we have undertaken or contributed to as a subcontractor.
These reference projects allow you to realise a good idea of how we can serve you. Discover through our completed projects how we can help realise your ideas.
Implementation of improving ecological quality and protecting fragile nature
Client: water board | nature organization
Location: The Zeegserloopje, Anloërdiep and Taarloosche diep
Period: 2020 to 2021
Form of contract: UAV-gc
Preserving authenticity, aesthetics and a wealth of biodiversity
Client: water board | nature organization
Location: Nieuwkoop lakes and the Haeck
Period: 2007 to 2021
Finance flow: LIFE project
Form of contract: UAV-gc
Making a contribution with our expertise in a cultural-historical area
Client: nature organization
Location: The Wieden and the Weerribben
Period: 2010 to 2012
Finance flow: LIFE project
Form of contract: UAV-gc
Turn over the top layer of the peat bog and dig up large areas of heathland and peat moss to preserve biodiversity.
Client: nature organization
Location: Fochteloërveen
Period: 2024
Nature restoration for conservation of flora and fauna
Client: nature organization
Location: Botshol
Period: 2011 to 2017
Form of contract: UAV-gc
Beauty that comes naturally.
Client: nature organization
Location: Zuidlaardermeer
Period: 2016 to 2017
Form of contract: UAV-gc
Make preparations for enabling placement of floating solar park.
Client: RWE
Location: Cologne, Frechen
Period: 2024
Year: 2020
Number of solar panels: 40.000
Number of megawatts: 14 MW
Depth: 16 to 41 meters
Number of households supplied with electricity: 4,500
Year: 2019 to 2020
Number of solar panels: 72,000
Number of megawatts: 27.3 MW
Depth:
Number of households supplied with electricity: 7,000
Year: 2020
Number of solar panels: anchoring constructed for 17,280
Number of watts: 7 gigawatt hours (GWh)
Depth: 10 to 15 meters
Number of households supplied with electricity: 2,000
Year: July 2024
Number of solar panels: 6,000
Number of megawatts: 2.1 MW
Depth: 16 to 41 meters
Energy for your own use
Year: 2020
Number of solar panels: 40.000
Number of megawatts: 14 MW
Depth: 16 to 41 meters
Number of households supplied with electricity: 4,300
Year: September 2024
Number of solar boats: 420
Number of megawatts: 3.6 MW
Depth: 16 to 41 meters
Energy for your own use
Year: 2020
Number of solar panels: 33.000
Number of megawatts: 13.6 MW
Depth: 16 to 41 meters
Number of households supplied with electricity: 4,000
Year: March 2024
Number of solar panels: 27,160
Number of megawatts: 15 MW
Depth: 16 to 41 meters
Energy for your own use
Year: July 2024
Number of solar panels: 40.000+
Number of megawatts: 15 MW
Depth: 16 to 41 meters
Number of households supplied with electricity: 6,400
Year: February 2025
Number of solar boats: 198
Number of megawatts: 2.01 MW
Depth: 8 to 30 meters
Energy for your own use
Year: 2020
Number of solar panels: anchoring installed for 16,000, total 39,000
Number of megawatts: 14 MW
Depth: 16 to 41 meters
Number of households supplied with electricity: 2,300
Year: 2020
Number of solar panels: 56,056
Number of megawatts: 30 MW
Depth: 16 to 41 meters
Number of households supplied with electricity: 8,000
Year: 2023
Number of solar panels: 4.683
Megawatt: 2,6 Map
Depth: 0,5 - 1m
Goal: Gebruik in het nabij gelegen bedrijventerrein.
Dredging operations while ebb & flow and 24/7 service have major influences.
The deployment of a complete dredging set including DOP, piping and machine.
Making a contribution in a cultural heritage area in preparation for the breeding season.
Provide support to the salvage operation of the cargo barge that ran into trouble at the lock due to a strong current.
We also do activities for recreation locations, such as here on the largest cable water ski track in the whole of the Netherlands.
Part of realizing world's longest Interconnector opportunity between UK & Denmark.
Remove non-native aquatic plants for better habitat for all organisms in the water body.
Contributing to the widening and deepening project of the Juliana Canal.
Being part of a project where sheet piling was installed using a vibrating block on our WK95 NG-A.
Tried to Geocode:
Error Type:
Please be sure to follow the tutorial on how to setup the Google APIs required for the Advanced Google Map Widget.
Google Map API Key TutorialTogether we are committed to our mission; to provide ingenious solutions for in and around the water.
© Copyright 2025 Knoop B.V. – Privacy Statement -. General terms and conditions