Floating solar park Emstek

4 solar parks in a summer, no problem

Project overview

Project description

With the project in Emstek, we are closing an impressive series of four anchoring systems in a row that we completed in the summer of 2024. After successful projects in Philippsee, Coesfeld and Raalte, we have also used our developed and proven method here.

Until now, Emstek was the most beautiful location where we were allowed to carry out our work. A very quiet area with clear blue water.

The composition on the anchoring platform that we used earlier in Raalte proved so effective that we now use it as standard. The efficiency of our work had improved significantly.

On location we made several adjustments to the anchors, to ensure that it all went well & smoothly. Due to customization, we can guarantee a solid base for the floating solar park that is placed here. All anchors are provided with correct and complete documentation. All anchors have passed a tensile test, again to guarantee the stability and strength of the anchoring system.

Logistically, it was a challenge to realize four parks in a single summer. But through good communication and a clear overview, it went without any problems. With four successful installations in a row, we look forward to the next project with confidence!

Picture of Kirsten Kruze

Kirsten Kruze

Project Manager Knoop BV

Verankeringsproject - Verankeringssysteem referentie project- Zichtbaar: Aanwezigheid op verankeringsplatform, samenwerken, protocollen opvolgen, veiligheid waarborgen, persoonlijk bescherming middelen aanwezig

material

  • Platform of coupling pontoons
  • Winch system
  • Crane with lance
  • 3D GPS system
  • Workboats
  • Powerpack
  • Generator
  • Different types of lines
  • Buoys
  • Anchors

View our other projects